TO-DOs:

  • Improve image workflows

    • Where are images stored?
    • How can people access images?
    • How do we link images to arenas/projects to make them easy to find?
  • Task dependencies

    • Many projects or tasks are dreams that require others to be completed first
    • However, these dreams are important because they create a shared vision for the future.
    • As such, tasks and projects should create a network of dependencies where some are only possible after the previous ones are completed.
    • Can we use a Canvas board on Anytype for this?
  • Documentation / Task logs

    • We are starting to have a workflow for adding tasks. However, once a task is completed, it is not sufficient to mark it “Complete”.
      • What was learned?
      • Who did it?
      • Was it a sucess? Is success only measured in the future (e.g., a tree was planted, did it survive?)
      • I think a new Type is needed for documentation of progress on tasks.
      • Maintenance tasks dont need documentation, but maybe they need a “log”. How often is this maintenance task done, is it time to do it again
      • Project/complex tasks may need documentation

Alex

  • For me, there is a distinction between “Tasks” which are a single, one time-only task that are part of Project, and “Maintenance Tasks” which must be done repeatedly.
  • To solve this, I added a property “Task type” to “Tasks” which we can set to “Maintenance” or “Project”
  • The same Maintenance Tasks occur in many Zones/Subzones, which creates a problem: we must duplicate the same Task many times for every Zone/Subzone.
  • My solution: to create three distinct types
    • Task Guides: They are generic guides that apply to ALL tasks (no matter the Zones/Subzone). Example:

→ Hedging

  • Maintenance Task: It is a task object with a property “Maintenance”. It is SPECIFIC to that Zone/Subzone and tells people how often the Task should be done, when it is scheduled next, and when done it can be “completed”. Example:

→ Maintain hedge along the road

  • Maintenance Log: It is a object that is created automatically everytime a Maintenance Task is completed, to maintain the history/frequency of the doing of that Task, who did it, how long it took, what tools were used, what tricks were learned to make it more efficient (TO-DO

Romain

So here is the idea we came up with for the structure, don’t hesitate to challenge it and present yours.

  • Project Viola Introduction Page (Viola Beach, the genesis, workaway, interractive map, our vision).
  • Waterfall structure for Zone and Sub zone → We create a template with selected properties for both type of object. Both can have backlink projects, depends where project applies.
  • Projects (only construction). Same as Zone and Subzone we create a template and projectlink to them tasks (template too)
  • Task (template too), two type of task either construction or maintenance. If they are maintenance we link them with their properties to zone or sub zone and if they are construction we projectlink them to project but also with zone and subzone with the property function.
  • Then we can create other type with template too like Tools, flora, guide, recipe and link and call them when needed inside zone, subzone, project or taks page.
  • Finally member type, to assign people to tasks and projects

Everything is an object. Zone, Sub-zone, project, task, member, chat, queries, tools, flora are a type of object.
*If you click on a type category, you can see all the objects in it with a grid format. Easily display the property and link them to other object